On August 27, the thermal load test of 2.7 million tons of special steel project of a large steel enterprise in Linyi, which was contracted by MCC Jingcheng General Contract and built by Xiye Group, was successful.The project for the general contract of MCC Jingcheng Xiye Group construction, from the contract signing, equipment design, manufacturing, inspection, including equipment packaging and transportation, site construction, installation and commissioning of Xiye people close cooperation, joint efforts, in the full trust and support of the owner, in the cooperation of suppliers and partners, the project thermal load test a success.
With the support of the owner, Xiye people adhere to the good style of integrity, pragmatism and refinement, in the entire project implementation, fine design, excellent plans, measures, strong implementation, to overcome the epidemic, tight schedule and other adverse factors; Xiye people adhere to the working attitude of "excellence", solidly promote the project, complete the tasks on time and with high quality, and escort the owner of the plant to improve quality and efficiency.
Post time: Aug-23-2023